Home
Elementary School
Library
fire department
water treatment plant
Contact

The Smith Academy High School

Weatherization measures were done to the high school that resulted in reduce loads on space conditioning equipment. Tighter and better insulated buildings allow mechanical equipment to run less often and still maintain the desired interior environment. the results of a successful weatherization project are reduced fuel consumption, reduced utility cost and improved occupant comfort.